This post will be updated regularly with information pertinent to construction and renovations of neighborhood infrastructure.
Have information you would like added that is not listed? Contact us.
JANUARY 2026
- LOCATION: Southeast Heights
- WHEN: January 2026
- WHY: Fiber Installation
STARTING January 2026, fiber construction by Gigapower will be ongoing throughout the Southeast Heights.
WHAT TO EXPECT:
– Temporary Traffic Control
– Micro trenching (3-inch cut along pavement, boring, directional ceiling)
– Restoration Guaranteed (will be returned to original condition)
– Trenches will be safe to drive over
Expect multiple contractors to be working on this project.
